University of MD Capital One Stadium


  • Install 5 new cross-arms with 8 fixtures using Musco provided “W” brackets and threaded rods to pole top.
  • Install 12 driver ECE cabinets at electrical distribution area
  • Replace current LCC cabinet with new LCC cabinet
  • Install Musco ALIC emergency power contractor cabinet next to normal power LCC cabinet
  • Install new support poles and new cross-arms with 12 fixtures

Category:

Tags: